Niavicta builds nianav OS in the open, with the people who use it.Talk to us ›
Niavicta nianav OS
Talk to us
How it works · Step 3 of 5

The compliance matrix.

Every requirement, mapped before you do any work. Each clause is connected to the procedure that satisfies it, the evidence that proves it, and the person accountable for it.

Mapping Standards decomposed into individual, trackable, pre-mapped requirements.

87 requirements. 132 clauses. Nothing left dangling.

The standards from step two are not prose to be read. They are decomposed into individual, trackable requirements. nianav OS pre-maps each one so the obligation, the procedure, the evidence type, and the owner are linked from the start.

That is what makes gaps visible in real time. If a clause has no procedure, or a procedure with no evidence, the matrix shows it immediately, not at the audit.

Clause
ProcedureThe documented process that satisfies it.
Evidence typeThe record that will prove it was done.
Owner roleThe named role accountable for it.
Real-time gap detection. Missing links surface the moment they appear.
87 requirements identified · 132 clauses mapped. Every one traceable back to a standard, and through it, to a single answer you gave in Project Zero.
Keep going Each mapped clause now pulls in a real procedure.

See your own clauses mapped.

We can walk one standard through the matrix on your scope, so you can see where the gaps are before anyone else does.